1. Installation sequence is as follows: 1.1 First, determine the installation location of the UPS and battery cabinet upon arrival at the site. 1.2. Install the battery connection Wires.
Remove the side panels that are adjacent to the other battery cabinets. Push the right-most battery cabinet into position. For seismic anchoring, ensure that the rear seismic bracket connects to the rear anchors. Lower the levelling feet until they connect with the floor - use a bubble-leveler to ensure that the cabinet is level.
1.2. Install the battery connection Wires. A. Determine the location of the battery switch, the positive and negative directions of the batteries in the battery cabinet, and install the air switch and terminal connectors on the battery cabinet. B. Connect the positive terminal of the battery to the air switch.
Reinstall the left side panel on the left-most battery cabinet after interconnection. Push the third battery cabinet into position, align with the seismic anchoring (if any), level the battery cabinet, and interconnect with the other battery cabinets as described in step 2, step 3, and step 5.
Refer to the illustration, “Cabling 3U Cabinets in Parallel,” above, and connect the UPS-to-battery cable to Connectors A on each battery cabinet in the battery string.
Free Quote
Prepare for Installation. Install the Rear Seismic Anchoring. Position and Interconnect the Battery Cabinets. Install the Front Seismic Anchoring. Install the Battery Modules in the Battery Cabinet.
Free Quote
F. Before connecting the battery cables from the battery cabinet to the host, measure the battery voltage with a multimeter, which should be 103.36V, and check if the positive and negative
Free Quote
Rear View Lower the levelling feet until they connect with the floor - use a bubble-leveler to ensure that the cabinet is level. Push the second right-most battery cabinet into position, align with the seismic
Free Quote
Connect main cables from the UPS or charger source to the battery cabinet output. The battery cabinet output connection point will vary depending on the cabinet configuration. The main output connection
Free Quote
This manual provides installation and operation instructions for the Galaxy Lithium-ion Battery Cabinet.
Free Quote
Connect the power system''s battery cable terminated in an Anderson connector to the first battery cabinet''s battery cable terminated in a mating Anderson connector.
Free Quote
AdapterPower supply Battery 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Power fittings for connecting to the inverter Power fitting for connecting to the battery packs Communication port
Free Quote
C:02114914,02114916,02114917,02114923,02114918,02114919,02114920,02114922,02114710,02114711,02114712,02114713,02114718,02114719,02114720;M:FR42611W,FR426135W,FR42612W
Free Quote
Connects the battery cabinet to the UPS Automatically locks the battery cabinet door to prevent access to the cabinet interior during its operation as a power backup to the UPS.
Free QuoteHigh-capacity LiFePO4 and gel batteries with smart BMS, scalable from 2.4kWh to 500kWh – ideal for mining, telecom, and industrial self-consumption.
Advanced multi-MPPT inverters (up to 6 trackers) and rugged DC power systems for telecom base stations, ensuring 24/7 uptime in remote locations.
AI-driven self-consumption optimization, carbon accounting, and real-time energy analytics to help industries achieve net-zero targets.
Mining-grade power supplies, inverter monitors, load controllers, and data acquisition systems for underground and surface operations.
We provide industrial energy-saving components, deep cycle solar batteries, multi-MPPT inverters, telecom power supplies, and smart energy systems tailored for the South African mining and industrial sectors.
From project consultation to after-sales support, our team ensures reliability and performance.
Unit 7, Rustenburg Industrial Park, 47 Karee Street, Rustenburg, North West, 0300, South Africa
+27 14 597 3820 | +27 82 456 7832 | [email protected]